Routers for BEAD-funded broadband builds

IP Infusion delivers routers for BEAD-funded broadband: OcNOS-SP preloaded on qualified hardware for tower, aggregation and middle-mile sites, under one support contract, with sourced answers to the questions a BEAD equipment RFP asks.

26qualified OcNOS-SP platforms
32G to 14.4Tcapacity, one OcNOS-SP
900+Betreiber setzen OcNOS ein

Where OcNOS routers fit in a BEAD network

A BEAD network carries subscriber traffic from towers and OLTs to an interconnection point. OcNOS-SP routers handle that traffic at towers or POPs, at aggregation sites, and along the middle-mile path to the internet.

Select a site to see the router's role

Subscribers on fiber and fixed wireless connect to a tower or POP router, then an aggregation router, then a middle-mile path to an internet interconnection point. All three routers run OcNOS-SP Subscribersfiber, fixed wireless Tower or POPOcNOS-SP AggregationOcNOS-SP Middle MileOcNOS-SP Internetinterconnection point 1G and 10G handoffs32 bis 120 Gbps 25G and 100G uplinks300 to 800 Gbps 100G and 400G transport800 Gbps to 14.4 Tbps

Tower and POP. Collects fixed wireless radios and small OLTs over 1G and 10G and sends them upstream over MPLS or SR-MPLS. Seven routers from 32 to 120 Gbps fit here, and six of them are temperature-hardened, rated -40°C to 65°C in their datasheets.

Schematische Darstellung.

Answers for a BEAD equipment RFP

Answers to the network equipment questions BEAD subgrantees and their partners ask, with the NTIA or Commerce source for each program rule.

Buy America (BABA)

BABA applies to every BEAD project. The Commerce waiver for BEAD is in effect from 22 February 2024 to 22 February 2029. It waives the Buy America preference for electronics, including routers and switches. The waiver does not cover four categories: OLTs and remote OLTs, OLT line cards, subscriber-facing optic pluggables, and standalone ONTs and ONUs.

No manufacturer letter for waived routers. NTIA's certification letters and the Commerce self-certification list cover equipment in those four categories that is made in the United States. NTIA states that a letter is not needed for waived equipment.

Report waived electronics on NTIA's tracker. For each finished waived product, subgrantees list its manufacturer, category (for example, router or switch), 10-digit HS code, product identifier, a plain description of its function, country of origin, and quantity. They share the tracker with their Eligible Entity, the state or territory broadband office.

Sources: Commerce BEAD BABA waiver, NTIA BABA compliance and reporting requirements, October 2025, NTIA BEAD FAQ v17

Covered equipment

BEAD funds, including the non-federal match, cannot buy or support communications equipment covered by the Secure and Trusted Communications Networks Act (47 U.S.C. 1608) or 2 CFR 200.216.

Source: BEAD General Terms and Conditions, Nov 2025

Cybersecurity and supply chain plans

Before funds flow, a subgrantee attests to a cybersecurity risk management plan that reflects the NIST Cybersecurity Framework and Executive Order 14028, and a supply chain risk management plan based on NISTIR 8276 and NIST SP 800-161.

OcNOS-SP capabilities that support the plan, on every OcNOS-SP platform:

  • TACACS+ and RADIUS for administrator access
  • NETCONF over SSH or TLS, and gNMI over TLS, for management
  • RPKI: BGP rejects routes whose origin validates as invalid
  • Access control lists on management, VTY and loopback interfaces

IP Infusion is registered to TL 9000, the telecom quality management standard.

Sources: BEAD NOFO, section IV.C.2.c.vi, OcNOS-Feature-Matrix

Performance and reliability targets

A BEAD network must deliver at least 100 Mbps down and 20 Mbps up, keep 95 percent of latency measurements at or below 100 ms round trip, and average no more than 48 hours of outage in any 365 days.

OcNOS-SP features for these targets: TI-LFA moves traffic to a precomputed backup path on SR-MPLS, BFD detects a failed link, EVPN multihoming dual-homes the access, and VRRP backs up the gateway.

Sources: BEAD NOFO, section IV.C.2.a, broadband aggregation

Room to grow

NTIA's 2025 notice defines a priority project as one that can easily scale speeds over time and support 5G and later wireless technologies. OcNOS-SP is the same software on routers from 32 Gbps to 14.4 Tbps, so a site can move to a larger router and keep its configuration model and operations. Seven of them, from 800 Gbps to 14.4 Tbps, carry 400G ZR/ZR+ optics.

Source: BEAD Restructuring Policy Notice, June 2025

Support, RMA and how to buy

OcNOS Systems ship with one support contract covering software, hardware, optics and RMA, with priority 1 response times down to 30 minutes depending on the support tier. Buy through partners such as RocNet Supply and Netceed, or from IP Infusion directly.

More: OcNOS-Systeme, support, how to buy

Have a BEAD RFP open? Send us the sites, timeline and what the RFP asks for, and we reply with routers by site and help on the equipment section.

Discuss your BEAD project

OcNOS-SP routers by site

Starting points for each site. All 26 routers qualified for OcNOS-SP are listed below the table.

UfiSpace S9501-28SMT router

Tower and small POP

UfiSpace S9501-28SMT

120 Gbps · 20 × 1G, 8 × 10G

Temperature-hardened, rated -40°C to 65°C

Edgecore AS7535-28XB router

Aggregation and middle mile

Edgecore AS7535-28XB

800 Gbps · 24 × 25G, 2 × 100G, 2 × 400G

400G ZR/ZR+ with OcNOS-SP PLUS

UfiSpace S9600-56DX router

Regional aggregation and core

UfiSpace S9600-56DX

4.8 Tbps · 4 × 25G, 48 × 100G, 8 × 400G

400G ZR/ZR+ with OcNOS-SP PLUS

Starting points by site
RouterKapazitätPortsOcNOS-SP editions400G ZR/ZR+
Tower and small POP
UfiSpace S9502-12SM32 Gbps8 × 1G, 4 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
UfiSpace S9501-28SMT120 Gbps20 × 1G, 8 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
Aggregation and pre-aggregation
UfiSpace S9500-22XST300 Gbps4 × 1G, 8 × 10G, 8 × 25G, 2 × 100G; temperature-hardenedIPBASE, MPLS, CSRNein
Edgecore AS7535-28XB800 Gbps24 × 25G, 2 × 100G, 2 × 400G; temperature-hardenedIPBASE, MPLS, PLUSWith PLUS
UfiSpace S9510-28DC800 Gbps24 × 25G, 2 × 100G, 2 × 400G; temperature-hardenedIPBASE, MPLS, PLUSWith PLUS
Middle mile, regional aggregation and core
UfiSpace S9600-72XC2,4 Tbps64 × 25G, 8 × 100GIPBASE, MPLS, PLUSNein
UfiSpace S9600-56DX4.8 Tbps4 × 25G, 48 × 100G, 8 × 400GIPBASE, MPLS, PLUSWith PLUS
UfiSpace S9610-36D14.4 Tbps36 × 400GIPBASE, MPLS, PLUSWith PLUS, 18 of 36 ports
Show all 26 qualified routers
All 26 OcNOS-SP routers, from the OcNOS Feature Matrix
RouterKapazitätPortsOcNOS-SP editions400G ZR/ZR+
Tower and small POP
Edgecore AS5915-16X32 Gbps12 × 1G, 4 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
UfiSpace S9502-12SM32 Gbps8 × 1G, 4 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
UfiSpace S9502-12SM-NT32 Gbps8 × 1G, 4 × 10GIPBASE, MPLSNein
UfiSpace S9502-16SMT32 Gbps12 × 1G, 4 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
Edgecore AS5915-18X64 Gbps12 × 1G, 6 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
UfiSpace S9501-18SMT64 Gbps12 × 1G, 4 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
UfiSpace S9501-28SMT120 Gbps20 × 1G, 8 × 10G; temperature-hardenedIPBASE, MPLS, CSRNein
Aggregation and pre-aggregation
Edgecore AS7315-27X300 Gbps20 × 10G, 4 × 25G, 3 × 100GIPBASE, MPLS, CSRNein
UfiSpace S9500-22XST300 Gbps4 × 1G, 8 × 10G, 8 × 25G, 2 × 100G; temperature-hardenedIPBASE, MPLS, CSRNein
UfiSpace S9500-30XS300 Gbps20 × 10G, 8 × 25G, 2 × 100GIPBASE, MPLS, CSRNein
Edgecore AS7515-24X360 Gbps20 × 25G, 4 × 100G; temperature-hardenedIPBASE, MPLS, PLUSNein
UfiSpace S9510-30XC360 Gbps28 × 25G, 2 × 100G; temperature-hardenedIPBASE, MPLS, PLUSNein
Edgecore AS5916-54XKS800 Gbps48 × 10G, 6 × 100GIPBASE, MPLS, CSRNein
Edgecore AS5916-54XL800 Gbps48 × 10G, 6 × 100GIPBASE, MPLS, CSRNein
Edgecore AS7535-28XB800 Gbps24 × 25G, 2 × 100G, 2 × 400G; temperature-hardenedIPBASE, MPLS, PLUSWith PLUS
UfiSpace S9510-28DC800 Gbps24 × 25G, 2 × 100G, 2 × 400G; temperature-hardenedIPBASE, MPLS, PLUSWith PLUS
Middle mile, regional aggregation and core
Edgecore AS7946-30XB2,4 Tbps4 × 25G, 22 × 100G, 4 × 400GIPBASE, MPLS, PLUSWith PLUS
Edgecore AS7946-74XKSB2,4 Tbps64 × 25G, 10 × 100GIPBASE, MPLS, PLUSNein
UfiSpace S9600-28DX2,4 Tbps4 × 25G, 24 × 100G, 4 × 400GIPBASE, MPLS, PLUSWith PLUS
UfiSpace S9600-32X2,4 Tbps32 × 100GIPBASE, MPLS, PLUSNein
UfiSpace S9600-72XC2,4 Tbps64 × 25G, 8 × 100GIPBASE, MPLS, PLUSNein
UfiSpace S9600-56DX4.8 Tbps4 × 25G, 48 × 100G, 8 × 400GIPBASE, MPLS, PLUSWith PLUS
UfiSpace S9600-64X4.8 Tbps64 × 100GIPBASE, MPLS, PLUSNein
Edgecore AS9947-36XKB7.2 Tbps4 × 10G, 24 × 100G, 12 × 400GIPBASE, MPLS, PLUSWith PLUS
UfiSpace S9610-46DX7.2 Tbps4 × 25G, 40 × 100G, 6 × 400GIPBASE, MPLS, PLUSNein
UfiSpace S9610-36D14.4 Tbps36 × 400GIPBASE, MPLS, PLUSWith PLUS, 18 of 36 ports

Qumran 2A and Qumran 2U platforms

Four platforms use Broadcom Qumran 2A or Qumran 2U silicon. Two are from Edgecore and two from UfiSpace. Each is qualified for OcNOS-SP. Each card lists the manufacturer, model, ports, power, timing, operating temperature and OcNOS-SP software SKUs for an equipment list.

Qumran 2A: 800 Gbps, two 400G ports

Edgecore AS7535-28XB router, front view
Edgecore AS7535-28XB CSR440
Description
1RU router, Broadcom Qumran 2A
Kapazität
800 Gbps
Ports
24 × 25G SFP282 × 100G QSFP282 × 400G QSFP-DD
Stromversorgung
Two hot-swappable supplies; AC or -48 V DC
Timing
IEEE 1588v2, SyncE, GNSS input
Temperature
-40°C to 65°C operating; temperature-hardened
OcNOS-SP SKUs
OCNOS-SP-IPBASE-800OCNOS-SP-MPLS-800OCNOS-SP-PLUS-800
400G ZR/ZR+ support
With OcNOS-SP PLUS
UfiSpace S9510-28DC router, front view
UfiSpace S9510-28DC
Description
1RU router, Broadcom Qumran 2A
Kapazität
800 Gbps
Ports
24 × 25G SFP282 × 100G QSFP282 × 400G QSFP-DD
Stromversorgung
Two hot-swappable supplies; AC or -48 V DC
Timing
IEEE 1588v2, SyncE, GNSS input
Temperature
-40°C to 65°C operating; temperature-hardened
OcNOS-SP SKUs
OCNOS-SP-IPBASE-800OCNOS-SP-MPLS-800OCNOS-SP-PLUS-800
400G ZR/ZR+ support
With OcNOS-SP PLUS

Qumran 2A platform page

Qumran 2U: 360 Gbps, 25G access, 100G uplinks

Edgecore AS7515-24X router, front view
Edgecore AS7515-24X CSR430
Description
1RU router, Broadcom Qumran 2U
Kapazität
360 Gbps
Ports
20 × 25G SFP284 × 100G QSFP28
Stromversorgung
Two hot-swappable supplies; AC or -48 V DC
Timing
IEEE 1588v2, SyncE, GNSS input
Temperature
-40°C to 65°C operating; temperature-hardened
OcNOS-SP SKUs
OCNOS-SP-IPBASE-300OCNOS-SP-MPLS-300OCNOS-SP-PLUS-300
400G ZR/ZR+ support
Nein
UfiSpace S9510-30XC router, front view
UfiSpace S9510-30XC
Description
1RU router, Broadcom Qumran 2U
Kapazität
360 Gbps
Ports
28 × 25G SFP282 × 100G QSFP28
Stromversorgung
Two hot-swappable supplies; AC or -48 V DC
Timing
IEEE 1588v2, SyncE, GNSS input
Temperature
-40°C to 65°C operating; temperature-hardened
OcNOS-SP SKUs
OCNOS-SP-IPBASE-300OCNOS-SP-MPLS-300OCNOS-SP-PLUS-300
400G ZR/ZR+ support
Nein

Qumran 2U platform page

See the Buy America (BABA) answer above for the Commerce waiver and the fields of NTIA's waived-electronics tracker.

Feature support varies by platform and edition. See the OcNOS-Feature-Matrix and the Hardware-Kompatibilitätsliste.

Questions about BEAD network equipment

BEAD (Broadband Equity, Access, and Deployment) ist ein Bundesförderprogramm der NTIA über 42,45 Milliarden US-Dollar. Bundesstaaten und Territorien vergeben Unterzuschüsse an Anbieter, die Breitband zu unversorgten und unterversorgten Standorten bauen. Die NTIA hat im August 2026 alle 56 Final Proposals der Bundesstaaten und Territorien genehmigt.
Seit der Restructuring Policy Notice der NTIA vom Juni 2025 kann jede Breitbandtechnologie, die die Leistungsanforderungen des Programms erfüllt, im Wettbewerb antreten, Glasfaser und Fixed Wireless eingeschlossen. Die Notice hat den Glasfaservorrang aus der ursprünglichen NOFO gestrichen.
Mindestens 100 Mbit/s im Download und 20 Mbit/s im Upload, wobei 95 Prozent der Latenzmessungen bei höchstens 100 Millisekunden Round Trip liegen. Ausfälle sollen über beliebige 365 Tage im Schnitt 48 Stunden nicht überschreiten. Community Anchor Institutions brauchen mindestens 1 Gbit/s in beide Richtungen.
Ja. Die BEAD NOFO erlaubt einem Projekt Middle-Mile-Infrastruktur, wo sie nötig ist, um Zusammenschaltungspunkte zu erreichen oder ein Projekt für unversorgte oder unterversorgte Standorte technisch machbar und finanziell tragfähig zu machen.
BABA gilt für alle BEAD-Projekte. Der Commerce-Waiver für BEAD, gültig vom 22. Februar 2024 bis 22. Februar 2029, hebt den Buy-America-Vorrang für Elektronik auf, mit Ausnahme von vier Kategorien: OLTs und Remote-OLTs, OLT-Linecards, teilnehmerseitige optische Pluggables sowie eigenständige ONTs und ONUs. Käufe aus ausländischen Quellen müssen weiterhin gemeldet werden.
OcNOS-SP läuft auf 26 qualifizierten Plattformen von Edgecore und UfiSpace mit 32 Gbit/s bis 14,4 Tbit/s. Router mit 32 bis 120 Gbit/s passen zu Funkmasten und POPs, mehrere davon temperaturgehärtet. Router mit 300 bis 800 Gbit/s passen zur Aggregation, Router mit 800 Gbit/s bis 14,4 Tbit/s zur Middle Mile und zum Core. Sieben unterstützen Optiken für 400G ZR/ZR+.
Über Partner wie RocNet Supply und Netceed oder direkt bei IP Infusion. OcNOS Systems werden mit einem Supportvertrag ausgeliefert, der Software, Hardware, Optiken und RMA abdeckt.

Program sources

Every BEAD rule on this page comes from one of these documents.

Plan the network for your BEAD award.

We map your towers, OLT sites and middle-mile paths to qualified platforms, and help your team answer the equipment section of the RFP.